CFSP

From Center for Friction Stir Processing Guide

(Difference between revisions)
Jump to: navigation, search
m (Add chapter 1 number)
m (Delete link since Alex does not think it should be generally available)
 
(31 intermediate revisions not shown)
Line 1: Line 1:
-
== Table of Contents ==
+
[[Image:nsf_cfsp_header.png||750px|center]]
-
*1. [[The Center for Friction Stir Processing]]
+
<h1 align=center style="border-bottom:0">
-
**1.1 CFSP Vision Statement
+
-
**1.2 CFSP Mission Statement
+
-
**1.3 CFSP Research Objectives
+
-
**1.4 CFSP Policies Procedures and Practices (P3)
+
-
*2. [[Constituting the Center]]
 
-
**2.1 Establishing a center vision and mission
 
-
***    2.1.1 Identifying technology development needs of the sponsors
 
-
***    2.1.2 Preparing a long term technology development roadmap
 
-
***    2.1.3 Identifying the focus research areas for each university site
 
-
***    2.1.4 Identification and selection of multi-year projects
 
-
**2.2 Bylaws
 
-
**2.3 Membership agreements
 
-
*** 2.3.1 Procedures for acceptance of new university sites
 
-
*** 2.3.2 Procedures for acceptance of new industry memberships
 
-
**2.4 Intellectual Property Agreements
 
-
*** 2.4.1 Protection of proprietary information
 
-
*** 2.4.2 Nondisclosure statements
 
 +
The Center for Friction Stir Processing<br><br>
 +
A Case Study for
 +
Managing <br><br> a Multi-site<br><br>  Industry/University Cooperative Research Center<br>
-
*3. Center Operations
+
</h1>
-
**3.1 Development of an interactive website and standardized forms
+
-
**3.2 Common searchable database of test results
+
-
**3.3 Center Document Management
+
-
*** 3.3.1 Quarterly reports
+
-
*** 3.3.2 Building a reference library
+
-
*** 3.3.3 University Documents
+
-
**3.4 Identification of supplemental research opportunities
+
-
**3.5 Papers and publications review and approval
+
-
**3.6 Managing tasks/projects work
+
-
***    3.6.1  Paperless Data Management System (PaDMS )
+
-
***    3.6.2  Projects in PaDMS
+
-
***    3.6.3  Tasks and subtasks in PaDMS
+
-
***    3.6.4  Work orders
+
-
***    3.6.5  Weekly reports
+
-
***    3.6.6  Naming conventions
+
-
**3.7 Social events (local)
+
-
+
-
*4. Meetings
 
-
**4.1 Annual Meetings Overview
 
-
*** 4.1.1  Setting the Agenda
 
-
*** 4.1.2 Pre-meeting workshops
 
-
*** 4.1.3 Non- member participation in IAB meetings
 
-
*** 4.1.4 Fall meetings
 
-
*** 4.1.5 Spring meetings
 
-
**4.2 Presentation at Meetings
 
-
*** 4.2.1 State of the Center presentation
 
-
*** 4.2.2 Executive Summary
 
-
*** 4.2.3 LIFE form evaluation
 
-
*** 4.2.4 LIFE form response form
 
-
*** 4.2.5 Industry presentations
 
-
*** 4.2.6 Posters
 
-
**4.3 Follow-up from the IAB Meetings
 
-
*** 4.3.1 Action Items
 
-
*** 4.3.2 Annual Members Report
 
-
**4.4 Site specific quarterly planning meetings
 
-
**4.5 Marketing and Social Events
 
 +
<h1 align=center style="border-bottom:0">
 +
[[Table of Contents]]
 +
<br><br>
 +
</h1>
-
*5. Center Assessments
+
 
-
**5.1 Annual NSF report
+
<div style="text-align: center;">
-
**5.2 Monitoring center performance against “best practices” metrics
+
<font size=3>
-
**5.3 Annual members reports
+
A supplement to Gray and Walters<br>
-
**5.4 Center Evaluator’s Report
+
 
 +
by
 +
<br>
 +
 
 +
Dr. William Arbegast, CFSP Center Director<br>
 +
 
 +
Dr. Antonette Logar<br>
 +
 
 +
Dr. Edward Corwin
 +
<br><br><br>
 +
 
 +
</font>
 +
</div>

Current revision as of 21:56, 25 January 2012


The Center for Friction Stir Processing

A Case Study for Managing

a Multi-site

Industry/University Cooperative Research Center


Table of Contents


A supplement to Gray and Walters

by

Dr. William Arbegast, CFSP Center Director

Dr. Antonette Logar

Dr. Edward Corwin


Personal tools